top of page

Forming Station
-
Pulp & Paper Facility.
-
Structural Design of the Forming station of the project.
-
142 Ton of Structural Steel.
-
The 28m tall Tower is designed to house pneumatic systems, drying & sifting equipment.
-
Seismic analysis performed through response spectrum due to structural irregularity.
-
Time history analysis of several dynamic exciting forces to ensure the vibration requirement of the structure.
3D Model Viewer







bottom of page

